← All solutions

DJI + XGRIDS · PROPERTY & FACILITY CAPTURE

The whole property.
From two perspectives.

Use DJI Matrice 4E for aerial coverage and Lixel L2 Pro for ground-level detail. Plan the capture and processing around the deliverable your client needs.

Plan my capture workflow →
Lixel L2 Pro operator scanning the grounds of a property

THE LOGIC BEHIND THE PAIRING

Coverage above. Detail at ground level.

01

See the site

Matrice 4E captures roofs, terrain and the wider property. Plan image overlap and control for the required mapping deliverable.

02

Fill in the close-up view

L2 Pro captures the spaces and surfaces seen from walking routes, including areas with limited aerial visibility.

03

Choose the processing workflow

Point clouds, maps and Gaussian splats are different outputs. DRT confirms the software license, compatible source data and processing scope before quoting the project.

Build the project kit.

Air-to-ground fusion is subject to the selected software version, license and capture requirements. This project guide does not include an automatic integration or a software license. DRT confirms the final list and quote with you.

THE WORKING SCENARIO

Plan the deliverable first.

Properties where roofs, grounds and indoor spaces need complementary capture.

01

Set the project scope

Agree outputs, coordinate reference, access and areas needing both aerial and ground coverage.

02

Prove the processing path

Test compatible aerial data and L2 Pro capture with the selected licensed software before scanning the whole property.

03

Complete the site

Use the verified capture method, review coverage and export a sample for client acceptance.

DRT confirms the scanner model, current software version, license and fusion requirements. L3 support for a specific fusion workflow is not assumed.

BUILD WITH DRT

Tell us about the job.

Share your equipment and working conditions. DRT can help with the component list, compatible add-ons and configuration quote.

888-356-6818
sales@droneroboticstec.com

Custom hardware, software and installation are quoted before purchase.
Equipment references & planning assumptions

Configuration references reviewed November 9, 2026. Choose the exact model and region when opening a manufacturer document. Kit connections and runtime calculations are DRT planning recommendations, not manufacturer certification of a combined system.