Field capture
Matrice 4E captures imagery for mapping and field review. Processing software and suitable RTK corrections are selected for the project.
FJDYNAMICS + DJI · MACHINE CONFIGURATION
Use aerial imagery to understand the site, then configure an AT2 Max steering system for your specific machine and correction source.
Request a machine-fit review →
TWO COMPLEMENTARY WORKFLOWS
Matrice 4E captures imagery for mapping and field review. Processing software and suitable RTK corrections are selected for the project.
AT2 Max provides steering guidance after the machine-specific adapter, harness, correction service, installation and calibration are confirmed.
The steering system uses a compatible vehicle electrical installation. A portable station is an optional field charging base for drone batteries and computers.
These products support separate tasks. Automatic transfer of drone maps into the steering system is not included or assumed. This is not a portable charging solution for Agras high-power flight-battery chargers.
FINISH THE CONFIGURATION
Tell DRT the tractor make, model, year and existing guidance equipment. We will quote the required fitting parts alongside any optional mapping or portable-power package.
Explore AT2 Max →See the separate mapping & solar kit →THE WORKING SCENARIO
Farm teams combining aerial field context with machine-specific tractor guidance.
Confirm make, model, year, steering interface, implement width and the appropriate FJD installation kit.
Choose corrections, install the matched components and complete calibration following FJD guidance.
Use a separately configured DJI mapping workflow for imagery when the farm needs it. Confirm any desired data transfer before quoting.
The drone and tractor systems serve distinct jobs. Automatic data exchange, agronomic analysis and variable-rate execution are not included by default.
BUILD WITH DRT
Share your equipment and working conditions. DRT can help with the component list, compatible add-ons and configuration quote.
Configuration references reviewed November 9, 2026. Choose the exact model and region when opening a manufacturer document. Kit connections and runtime calculations are DRT planning recommendations, not manufacturer certification of a combined system.