BAMBU LAB × ANKER SOLIX

Bring the print demonstration to the audience.

A Bambu Lab P1S and optional S5000 power source create a planned, supervised printing station where convenient mains power is unavailable.

See why it works ↓Explore the setup ↗
Products sold separately
Bambu Lab P1SBambu Lab P1SMake the part
Anker SOLIX S5000Anker SOLIX S5000Supply portable AC power

Why these products together

Move the demonstration to a suitable event space.

01

Bambu Lab

Show how the part is made

Bambu Lab P1S
Bambu Lab P1S

P1S turns a prepared model into a printed part, letting the audience see the process alongside completed examples.

02

Anker SOLIX

Supply AC where the event needs it

Anker SOLIX S5000
Anker SOLIX S5000

S5000 is an optional power source when the location has no suitable outlet and the measured energy need justifies the equipment.

What the combination gives you

A demonstration planned around the audience and the location.

  • A live printing demonstration
  • More choice of suitable event locations
  • One planned power setup

Confirm printer voltage, heat-up load, transport, ventilation and runtime. With suitable mains power, the station may be unnecessary.

The problems this setup addresses

The event space has no suitable nearby outletBring an AC source

How the benefit is achieved

A correctly matched power station can supply the printer and compatible presentation equipment within its output limits.

A finished sample does not explain the processShow how the part is made

How the benefit is achieved

Run a tested model on P1S so visitors can see the print process alongside completed samples.

An event leaves little room for troubleshootingRehearse the complete setup

How the benefit is achieved

Test the file, material, heat-up load, print duration and energy use before the session.

The combination, explained

Prepare the file. Power the setup. Show the process.

  1. Prepared modelSlice and test before the event
  2. S5000 AC sourceCheck voltage and peak demand
  3. Bambu Lab P1SPrint on a stable surface
  4. Demonstration partShow process and finished sample
The practical benefitA demonstration planned around the audience and the location.
Setup illustration. The print file and AC supply serve different roles. Plan suitable ventilation, a dry location and a supervised operating area.

Illustrative workflow

Example: a supervised maker workshop

Bring a short, pretested print and finished examples. Confirm the venue, transport and ventilation, then test the printer and power setup together before attendees arrive.

Best fit

Supervised maker workshops and events with a genuine need for portable AC power.

Already own equipment?

With a suitable wall outlet, begin with the printer and material. S5000 is a substantial 5kWh-class station; review transport and actual energy needs before adding it.

Workflow illustration

How the workflow comes together.

  1. 01

    Prepare

    Slice and test the model, choose filament and check the printer configuration.

  2. 02

    Check the load

    Review regional input ratings and measure heat-up and operating demand.

  3. 03

    Set up

    Place the station and printer in a suitable dry, ventilated location on a stable surface.

  4. 04

    Demonstrate

    Run a supervised test and plan energy for the full print plus setup time.

Products sold separately

Choose your setup.

Choose the P1S configuration and S5000 configuration separately. Filament, spare parts and event setup are additional unless included in the selected product.

Review setup and compatibility

Questions before choosing the setup

Do I need S5000 for normal P1S printing?

No. A suitable mains outlet is normally sufficient. Portable power is an optional solution for a specific location or energy requirement.

How long can it print?

Print material, temperatures, ambient conditions and other loads affect energy use. Measure the intended setup; a fixed print duration is not promised.

Is this a validated UPS package?

No. Backup transfer behavior must be tested separately for the exact setup. The products are offered as separate items.

A good setup starts with the right checks.
  • Confirm the exact regional printer input voltage, heat-up demand, outlet rating and any other loads before connecting.
  • A power station is not automatically a validated UPS for the printer. Test the intended transfer or backup behavior separately.
  • Runtime depends on material, bed and nozzle temperature, ambient conditions and conversion losses. No print-hour promise is included.
  • The displayed products are separate purchases; printer Combo contents do not include the power station.
Product referencesPrimary product ↗Companion product ↗

DRT SOLUTION PLANNING

Plan your event setup

Share your current equipment and the problem you want to solve. We will review the missing pieces and the configuration for your work.

888-356-6818