Flight infrastructure
Dock 3 with a Matrice 4D or 4TD, a suitable mounting location, reliable network access and the required flight-management account.
DJI + ANKER SOLIX · SITE CONFIGURATION
Dock 3 operations need dependable power, network coverage and a suitable installation. Start with the full operating plan.
Choose Dock & power →Plan the installation with DRT
WHAT BELONGS IN THE PLAN
Dock 3 with a Matrice 4D or 4TD, a suitable mounting location, reliable network access and the required flight-management account.
Review S5000 as a backup-energy option. Size panel count, input voltage, cables and storage against the site’s measured daily demand.
Specify weather protection, cable routing, grounding, surge protection and commissioning with a qualified installer.
ENERGY BUDGET FIRST
A 400 W array with four equivalent peak-sun hours and a 75% planning factor yields about 1.2 kWh per day. Dock 3 is rated up to 800 W input, while actual energy use depends on charging, cooling, heating and flight frequency.
S5000 and a 400 W panel are a sizing starting point, not an approved unattended off-grid installation. Dock’s internal backup battery does not charge the aircraft. Confirm transfer behavior, weather protection, local electrical requirements and overnight reserve before installation.
MANUFACTURER WALKTHROUGH
See the Dock 3 workflow before defining your site and power requirements.
DJI Dock 3 specifications ↗THE WORKING SCENARIO
Infrastructure teams evaluating repeatable remote inspection and documentation.
Check mounting, weather exposure, grounding, network access and operating requirements with qualified specialists.
Measure the complete site load and daily mission plan. Select storage, panels and reserve for local solar conditions.
Test normal supply, backup behavior, network recovery and the chosen operating procedures before unattended use.
Power equipment is a design candidate until the electrical design and site tests are complete. A panel rating alone does not establish continuous or off-grid operation.
BUILD WITH DRT
Share your equipment and working conditions. DRT can help with the component list, compatible add-ons and configuration quote.
Configuration references reviewed November 9, 2026. Choose the exact model and region when opening a manufacturer document. Kit connections and runtime calculations are DRT planning recommendations, not manufacturer certification of a combined system.