Streamlined Project Design

The advanced mode allows for an efficient and rapid creation of a project. First, set the master and secondary benchmarks, followed by drawing the field boundary and collecting interior points. Lastly, complete the design surface through parameter setting. All tasks are completed in a single workflow.

Load video:

Terrain Survey

The AL01 collects elevation data through boundary mapping and internal points collection, significantly eliminates environmental interference and ensures long-term operational efficiency and accuracy.

Load video:

Terrain Design

You can easily complete terrain designs through parameter settings and getting analytics like fill-and-excavation and earthwork movement. Moreover, you can also effectively trim terrain angles with slope terrain design, and set water flow direction for better water management.

Load video:

Record Reserve

Completed leveling tasks are automatically saved to your task list, therefore, you can access historical records of the entire process at any time to avoid duplicate work by reusing previously saved task records.

Load video:

GNSS-based Land Leveling System

Say goodbye to the laser system's troubling setup, limited signal coverage, and demanding weather conditions. Say hello to AL01, the GNSS-based land leveling system that achieves 2.5 cm accuracy¹, increases efficiency by 40%, and covers a larger area in comparison².